Halle de production de boîtes et de bracelets pour montres en acier à Meyrin pour Chopard SAHalle de production de boîtes et de bracelets pour montres en acier à Meyrin pour Chopard SA

Chopard, 3ème réalisation

Boxes and bracelets production hall for steel watches, 1217 Meyrin (GE)

Our new steel watchbox and wristband production hall is the second building that Chopard built with BAT-MANN Constructions SA. Our choice of partner naturally fell on BAT-MANN Constructions SA following our positive experience with the first building. We have once again found in BAT-MANN Constructions SA a reliable partner, rich in practical advice and capable of realizing a real estate project in extremely short time and within a strict budget. Thus we were able to start moving into the new premises 7 months after the first pick.

This new hall with a thermal concept for low energy consumption, houses the latest generation of equipment and a hundred people. It is a crucial part of our production cycle.

François Tissot

  • 4'500 m2
  • 23'000 m3
  • 11 month
  • 2006-2007